HomeStore

1ph EPS critical loads backup package for power cuts

Product image 1

1ph EPS critical loads backup package for power cuts

Critical Load Sub-Board – Reliable Backup Power for Essential Circuits

Ensure uninterrupted power to your most important household appliances and devices during outages with a Critical Load Sub-Board. This package includes a new sub-board with all necessary re-wiring of critical circuits to the EPS (Emergency Power Supply) output of your inverter, keeping essential systems running when the grid goes down.

Please note: This product is only available to purchase together with our installed systems.


What is a Critical Load Sub-Board?

A critical load sub-board (or panel) is a dedicated electrical panel installed downstream from your main consumer unit. It contains only the essential circuits you want to keep powered during a blackout.

Typical critical loads include:

  • Refrigerators & freezers

  • Medical equipment

  • Lighting circuits

  • Wi-Fi & communication devices

  • HVAC fans or other essential appliances

By isolating and prioritising these circuits, you can maximise battery efficiency without needing to back up your entire home.


How the EPS Setup Works

🔌 Separate Critical Load Panel Installation

  • Critical load breakers are transferred from the main panel to the new sub-board.

  • Ensures backup power is focused only on essential circuits.

⚡ Automatic or Manual Power Source Switching

  • Equipped with a transfer switch (ATS).

  • During normal operation, power flows from the grid.

  • In a power cut, the switch automatically transfers to the inverter/battery supply.

🔋 Battery & Inverter Integration

  • Batteries store energy, while the inverter supplies AC power to the sub-board.

  • Critical loads are seamlessly powered during outages.

📊 Load & System Sizing

  • Circuits are selected based on your inverter and battery capacity.

  • Prioritises energy efficiency and backup duration.

📱 Smart Load Control (Optional)

  • Advanced systems allow real-time monitoring and control of each circuit from your phone.

  • Manage loads flexibly during outages.


Advantages of a Critical Load Sub-Board

  • 💰 Cost Efficiency – Reduces need for larger, more expensive batteries.

  • Longer Backup Runtime – Only powers selected essential circuits.

  • 🔧 Simplified Installation – Easy to manage and expand.

  • Seamless Transfer – Quick, safe switch to backup power during outages.

  • 🔄 Future-Proof – Add more critical loads or expand storage later.


Why Choose a Critical Load Sub-Board?

Installing a dedicated sub-board for critical loads ensures peace of mind, knowing your most important devices remain powered when you need them most. Whether for homeowners, businesses, or medical reliance, it provides a smart, efficient, and scalable backup solution.

$249.71

Original: $713.45

-65%
1ph EPS critical loads backup package for power cuts

$713.45

$249.71

Product Information

Shipping & Returns

Description

Critical Load Sub-Board – Reliable Backup Power for Essential Circuits

Ensure uninterrupted power to your most important household appliances and devices during outages with a Critical Load Sub-Board. This package includes a new sub-board with all necessary re-wiring of critical circuits to the EPS (Emergency Power Supply) output of your inverter, keeping essential systems running when the grid goes down.

Please note: This product is only available to purchase together with our installed systems.


What is a Critical Load Sub-Board?

A critical load sub-board (or panel) is a dedicated electrical panel installed downstream from your main consumer unit. It contains only the essential circuits you want to keep powered during a blackout.

Typical critical loads include:

  • Refrigerators & freezers

  • Medical equipment

  • Lighting circuits

  • Wi-Fi & communication devices

  • HVAC fans or other essential appliances

By isolating and prioritising these circuits, you can maximise battery efficiency without needing to back up your entire home.


How the EPS Setup Works

🔌 Separate Critical Load Panel Installation

  • Critical load breakers are transferred from the main panel to the new sub-board.

  • Ensures backup power is focused only on essential circuits.

⚡ Automatic or Manual Power Source Switching

  • Equipped with a transfer switch (ATS).

  • During normal operation, power flows from the grid.

  • In a power cut, the switch automatically transfers to the inverter/battery supply.

🔋 Battery & Inverter Integration

  • Batteries store energy, while the inverter supplies AC power to the sub-board.

  • Critical loads are seamlessly powered during outages.

📊 Load & System Sizing

  • Circuits are selected based on your inverter and battery capacity.

  • Prioritises energy efficiency and backup duration.

📱 Smart Load Control (Optional)

  • Advanced systems allow real-time monitoring and control of each circuit from your phone.

  • Manage loads flexibly during outages.


Advantages of a Critical Load Sub-Board

  • 💰 Cost Efficiency – Reduces need for larger, more expensive batteries.

  • Longer Backup Runtime – Only powers selected essential circuits.

  • 🔧 Simplified Installation – Easy to manage and expand.

  • Seamless Transfer – Quick, safe switch to backup power during outages.

  • 🔄 Future-Proof – Add more critical loads or expand storage later.


Why Choose a Critical Load Sub-Board?

Installing a dedicated sub-board for critical loads ensures peace of mind, knowing your most important devices remain powered when you need them most. Whether for homeowners, businesses, or medical reliance, it provides a smart, efficient, and scalable backup solution.

You may also like

NEW
Thumbnail 1

£500 Deposit payment towards the total cost of an installed system

$679.48

-65%NEW
Thumbnail 1

3ph EPS critical loads backup package for power cuts

$876.53

$306.79

-65%NEW
Thumbnail 1

Installed Sigenergy Sigenstor | 3.6/5/6kW Hybrid Options | Fire Safety | Outdoor | High End | 10yr warranty | 100% D.O.D | Gateway for full house back up or EPS | Ave £331/kW

$7,148.12

$2,501.84

-65%NEW
Thumbnail 1

Installed Sigenergy Sigenstor | 8/10/12kW Hybrid Options | Fire Safety | Outdoor | High End | 10yr warranty | 100% D.O.D | Gateway for full house back up available | Ave £344/kW

$7,881.96

$2,758.69

-65%NEW
Thumbnail 1

Installed MyEnergi Libbi | 3.6/5kW Hybrid options | 10,000 cycles | IP65 | EPS available | Ave £406/kW

$5,049.89

$1,767.46

-65%NEW
Thumbnail 1

Gateway electrical wiring for full house backup - 3ph

$496.02

$173.61

-65%NEW
Thumbnail 1

Gateway electrical wiring for full house backup - 1ph

$360.12

$126.04